Search results for "Excess sludge reduction"

showing 3 items of 3 documents

Biological minimization of excess sludge in a membrane bioreactor: Effect of plant configuration on sludge production, nutrient removal efficiency an…

2018

Abstract Excess sludge minimization was studied in a MBR with pre-denitrification scheme. Sludge minimization, nitrogen removal performance and membrane fouling tendency were investigated in two configurations, characterized by a different position of the sludge retention reactor (SRR). In particular, the SRR was placed: i) in the return activated sludge line (Anaerobic Side-Stream Reactor – ASSR configuration) and ii) in the mainstream between the anoxic and aerobic reactor (Anaerobic Main-Stream Reactor – AMSR configuration). The achieved results demonstrated that the ASSR enabled a higher excess sludge reduction (74% vs 32%), while achieving lower biological nitrogen removal (BNR) (TN = …

Membrane foulingEnvironmental EngineeringNitrogen0208 environmental biotechnologyPopulationBioreactorBioengineering02 engineering and technology010501 environmental sciencesMembrane bioreactor01 natural sciencesNitrogen removalExcess sludge reductionWaste Disposal FluidNutrientBiomaBioreactorsBiomasseducationWaste Management and Disposal0105 earth and related environmental sciencesUncoupling metabolismeducation.field_of_studySettore ICAR/03 - Ingegneria Sanitaria-AmbientaleSewageChemistryRenewable Energy Sustainability and the EnvironmentMembrane foulingGeneral MedicineNitrogen removalPulp and paper industryAnoxic waters020801 environmental engineeringActivated sludgeDenitrificationMembrane bioreactorAnaerobic exerciseBioresource technology
researchProduct

Biological minimization of excess sludge in a membrane bioreactor: Effect of plant configuration on sludge production, nutrient removal efficiency an…

Excess sludge reduction Membrane bioreactors Membrane fouling Nitrogen removal Uncoupling metabolism
researchProduct

Enhanced Sewage Sludge Drying with a Modified Solar Greenhouse

2022

This work reports the results obtained with an innovative configuration of a closed-static solar greenhouse for sludge drying. The novelty of the solar greenhouse configuration consisted in using a forced ventilation system to provide hot air for sludge drying and the utilization of solar irradiation for energy supply. Wet sewage sludge (97% humidity) was successfully dried up to a residual humidity close to 5% after 25 days during wintertime. The increase of the airflow rate supplied under the sludge bed improved the sludge drying rate. Moreover, the fraction of volatile suspended solids decreased from 70% to 41% after 13 days, indicating that air supply promoted the simultaneous stabiliza…

Settore ICAR/03 - Ingegneria Sanitaria-Ambientaleexcess sludge reduction; convective drying; greenhouse; renewable energy; solar sludge drying; sustainable sludge managementGeneral Engineeringexcess sludge reduction convective drying greenhouse renewable energy solar sludge drying sustainable sludge managementClean Technologies; Volume 4; Issue 2; Pages: 407-419
researchProduct